A new floor every two weeks: House B

Editor
22.08.2025
A new floor every two weeks: House B - METAL TRADE COMAX, a.s.

The weather is on our side, so we are working non-stop.

We are currently working on the construction of apartment building B on the 4th floor.

We are starting with the lining of the window sills and also the walls in the garage area, where there will be cellars, a boiler room, and technical rooms.

In about a month, we will start installing windows in building B.

If you want to see what building B will look like when it’s finished, take a look at building A – the south and west sides of the building are clearly visible from Na Průhoně Street, and if you arrange a tour, you can see the inside of the building – high-quality fixtures and fittings, views, cellars, and garages. And, of course, the show apartment.

Contact our broker:
Ing. Jarmila Macková | prodej@bytycomax.cz | +420 604 544 889

Similar articles

43% of Block ‘C’ sold

Discover the specifications of Block ‘C’. In September, we launched sales for Phase III of the BYTY COMAX Velvary project (Block ‘C’). By the end of October, 43% of the flats had found their future owners. We invite you to view the interior specifications. The show flat is situated on…

COMAX APARTMENTS back on sale

Dear supporters of modern, sustainable living, We have launched sales for Phase III of the BYTY COMAX Velvary project (Block C). House ‘C’ comprises 35 flats ranging from 1+kk to 3+kk layouts, featuring the standards as previous phases alongside some new features, such as a new floor plan for the…