MTC Kolín to begin construction of a new hall

Editor
07.03.2026

MTC Kolín to begin construction of a new hall - METAL TRADE COMAX, a.s.A new industrial hall will be built on the premises of MTC Kolín s.r.o.

Based on a 10-year lease agreement, we will begin construction of a new modern industrial hall for the tenant in the spring of 2026 on the land of our subsidiary MTC Kolín s.r.o. It will be half of Hall C from the attached visualization and will have an impressive floor area of 5,500 m².

The hall will be designed as a single-story, double-aisled, heated building with a low gable roof. The hall will be lit and ventilated by skylights, and a gantry crane will be installed in each aisle. Completion of construction is planned for December 31, 2027.

MTC Kolín s.r.o., as the developer and administrator of the complex, will provide technical and maintenance services for the future operation of the hall.

  Site plan (PDF)

Visualization of the future hall in the terrainMTC Kolín to begin construction of a new hall - METAL TRADE COMAX, a.s.

Similar articles

COMAX B APARTMENTS – last 2 units

Apartment building B has the last 2 apartments available – final approval in September 2026 Building B has a total of 38 units, with the last 2 apartments available. These are 2 spacious 3+kk apartments on the 3rd and 4th floors, with windows facing east, south, and west. The 3+kk apartments…