March on the construction site as seen by a drone

Editor
14.03.2026
March on the construction site as seen by a drone - METAL TRADE COMAX, a.s.

Apartment buildings A and B

We will soon be introducing the “triplets.”

We have begun earthworks for the implementation of the third and final stage of the BYTY COMAX Velvary development project (apartment building C).

  • Apartment building A (33 apartments) has been duly completed and handed over to the owners.
  • Apartment building B (38 apartments) has been completed in terms of structural work and is undergoing work on the roof, facade, and interior.
  • Apartment building C (35 apartments) will be built on the site of the recently commenced groundwork – you can already get an idea of how organically it will fit into the environment (Fig. 4).

 

Similar articles

SOLROOF: 2-in-1 Solar Roof

In March 2026, we exhibited at the Brno Exhibition Center. At the Brno Building Fair, we unveiled the SOLROOF rooftop – a complete photovoltaic system that is seamlessly integrated into steel roofing without compromising on design or functionality. It generated significant interest among…

COMAX B APARTMENTS – last 2 units

Apartment building B has the last 2 apartments available – final approval in September 2026 Building B has a total of 38 units, with the last 2 apartments available. These are 2 spacious 3+kk apartments on the 3rd and 4th floors, with windows facing east, south, and west. The 3+kk apartments…